Search BMP:
search
ss
Entire BMP Web Site
entire site
Survey Reports
Survey Reports
go
Best Practices Surveys: Survey Reports
McDonnell Douglas Aerospace-St. Louis (Boeing Integrated Defense Systems) - St. Louis, MO:Design for Manufacturing and Assembly
Original Date: 05/08/1995
Revision Date: 01/18/2007
Figure 3-2. Production Flow Analysis