DoDI 5000.2: Operation of the Defense Acquisition System |
 |  |
| |
E4. ENCLOSURE 4
IT CONSIDERATIONS
E4.1. Mission-Critical/Mission-Essential Information
System
E4.1.1. Mission-Critical Information System. A system that
meets the definitions of "information system" and "national security system"
in the CCA (reference (l)), the loss of which would cause the stoppage of
warfighter operations or direct mission support of warfighter operations.
(Note: The designation of mission critical shall be made by a Component
Head, a Combatant Commander, or their designee. A financial
management IT system shall be considered a mission-critical IT system as defined by
the USD(C).) A .Mission-Critical Information Technology System. has the same
meaning as a "Mission-Critical Information System".
E4.1.2. Mission-Essential Information System. A system
that meets the definition of information system. in reference (l), that the
acquiring Component Head or designee determines is basic and necessary for
the accomplishment of the organizational mission. (Note: The designation of
mission essential shall be made by a Component Head, a Combatant Commander,
or their designee. A financial management IT system shall be considered a
mission-essential IT system as defined by the USD(C).) A .Mission-Essential
Information Technology System. has the same meaning as a "Mission-Essential
Information System".
E4.2. IT System Procedures
E4.2.1. The MDA shall not approve program
initiation or entry into any phase that requires milestone approval for an
acquisition program (at any level) for a mission-critical or
mission-essential IT system until the DoD Component CIO confirms
or certifies (for MAIS only) that the system
is being developed in accordance with reference (l). At a minimum, the DoD
Component CIO.s confirmation or certification shall include a written
description of the three materiel questions of section 3.6.4 and the considerations
in Table E4.T1.
E4.2.2. PMs shall prepare a table such as
the one illustrated at Table E4.T1. to indicate which acquisition documents
correspond to the CCA requirements. DoD Component CIOs shall use the
acquisition documents identified in the table to assess CCA compliance. The
requirements for submission of written confirmation
or certification (for MAIS only) shall be
satisfied by the DoD Component CIO.s concurrence with the PM.s CCA
Compliance Table. Issues related to compliance shall be resolved via the IPT
process. The cognizant PSA shall coordinate on the CCA Compliance Table. No
Milestone A, B, or Full-Rate Production decision (or their equivalent) shall
be granted for a MAIS until the DoD CIO certifies that the MAIS program is
being developed in accordance with the CCA.
E4.2.3. For MDAP and MAIS programs, the DoD Component CIO's
confirmation (for MDAP) and certification (for MAIS) shall be provided to
both the DoD CIO and the MDA.
E4.2.4. The DoD Components shall not award a contract for the
acquisition of a mission-critical or mission-essential IT system, at any
level, until the following have been accomplished:
E4.2.4.1. The DoD Component registers the system with the
DoD CIO;
E4.2.4.2. The DoD CIO determines the system has an
appropriate information assurance strategy; and
E4.2.4.3. The DoD Component CIO confirms that the system is
being developed in accordance with the CCA by complying with paragraph
E4.2.1 (above).
E4.2.5. The requirement to
confirm or, for MAIS only,
to certify CCA compliance applies to milestone decisions for each increment of
an evolutionary acquisition. The requirements of the
CCA apply to all IT (including NSS) acquisitions, but subparagraph E4.2.4,
above, applies only to mission-critical and mission-essential IT systems.
E4.2.6. At Milestone C, for MAIS, the MDA shall approve, in
coordination with DOT&E, the quantity and location of sites for a limited
deployment for IOT&E.
E4.2.7. When the use of commercial IT is considered viable,
maximum leverage of and coordination with the DoD Enterprise Software
Initiative shall be made.
E4.2.8. For financial management MAIS acquisition programs, the
MDA shall not grant any milestone or full-rate production approval, or their
equivalent, until the USD(C) certifies that the system is being developed and
managed in accordance with the DoD Financial Management Enterprise
Architecture (reference (t) and Sec.1004 of Pub.L. 107-314 (reference (ax))).
E4.2.9. An amount in excess of $1,000,000 may be obligated for
defense financial system improvement (i.e., a new, or modification of, a
budgetary, accounting, finance, enterprise resource planning, or mixed
(financial and non-financial) information system) only if the USD(C)
determines and certifies that the system is being developed or modified, and
acquired and managed in a manner that is consistent with both the DoD
Financial Management Enterprise Architecture and the DoD Financial Management
Enterprise Architecture Transition Plan. The USD(C) shall provide such
certification to the MDA before any milestone or full-rate production
approval, or their equivalent, is made by the MDA.
Table E4.T1. CCA Compliance Table
|
Requirements Related
to the Clinger-Cohen Act (CCA) of 1996 (reference (l)) |
Applicable Program Documentation **
|
|
*** Make a determination that the acquisition supports
core, priority functions of the Department |
ICD Approval |
|
*** Establish outcome-based performance measures linked to
strategic goals |
ICD, CDD, CPD and APB approval |
|
*** Redesign the processes that the system supports to
reduce costs, improve effectiveness and maximize the use of COTS
technology |
ICD, CDD, CPD and APB approval |
|
* No Private Sector or Government source can better
support the function |
Acquisition Strategy page XX, para XX AoA page XX
|
|
* An analysis of alternatives has been conducted
|
AoA |
|
* An economic analysis has been conducted
that includes a calculation of the return on investment; or for non-AIS
programs, a Life-Cycle Cost Estimate (LCCE) has been conducted There
are clearly established measures and accountability for program progress
The acquisition is consistent with the Global Information Grid
policies and architecture, to include relevant standards. The program
has an information assurance strategy that is consistent with DoD
policies, standards and architectures, to include relevant standards
To the maximum extent practicable, (1)
modular contracting has been used, and (2) the program is being
implemented in phased, successive increments, each of which meets
part of the mission need and delivers measurable benefit, independent of
future increments |
Program LCCE Program Economic Analysis for MAIS
Acquisition Strategy page XX APB APB (Interoperability KPP)
C4ISP (Information Exchange Requirements) Information Assurance
Strategy Acquisition Strategy page XX |
|
The system being acquired is registered |
Registration Database
|
|
 |
|
|
| |
| |